Preinstallation Steps (All Bays) - IBM eServer 220 xSeries Installation Manual

Hide thumbs Also See for eServer 220 xSeries:
Table of Contents

Advertisement

Preinstallation steps (all bays)

swap and hot-swap drive cages hold a maximum of three hard disk drives. The
drive cages comprise bays 5, 6, and 7.
Bay 2 comes without a device installed. This bay is for a 5.25-inch, half-high,
removable-media drive, such as a tape backup drive.
Bay 4 is for a 3.5-inch, slim, removable-media drive or SCSI hard disk drive.
Note:
The electromagnetic interference (EMI) integrity and cooling of the server are
both protected by having bays 1 through 4 covered or occupied. When you
install a drive, save the filler panel from the bay, in case you later remove the
drive and do not replace it with another.
Before you install drives in your server, verify that you have all the cables and any
other equipment specified in the documentation that comes with the drive. You might
also need to perform certain preinstallation activities. Some of the steps are required
only during the initial installation of an option.
1. Read "Safety" on page v, "Handling static sensitive devices" on page xi, and the
documentation that comes with your drive.
2. Choose the bay in which you want to install the drive.
3. Check the instructions that come with the drive to see if you need to set any
switches or jumpers on the drive.
Chapter 2. Installing options
19

Advertisement

Table of Contents
loading

Table of Contents