Installation Method; 1: Installation Of Hardware - abi IMAGE IQBoardA User Manual

Table of Contents

Advertisement

1: Installation of Hardware

Installation Method for Wall Mounting
Accessories:
Number
Description
1
Tapping Screws
2
Plugs
3
Hanging Support Bar
Steps: The height of the Hanging Support Bar, (as Figure 3-1) should be 190 cm
above floor. Fix the middle screw hole first, and then fix other 4 after checking with
a level, using the instructions below, depending on whether concrete, plaster or
wooden wall.
(1) Concrete wall or brick wall: Drill a hole with masonary drill (size 8), hammer
the green rawlplugs into the hole, fix hanging bar onto the wall with tapping screws,
and hang white board onto the hanging bar. Refer to Figure 3-2.
(2) Plaster wall: Drill a hole with metal drill bit (size 6), screw the wallmate screws
into the hole without damaging the plaster, fix hanging bar onto the wall with tapping
screws, and hang white board onto the hanging bar.
(3) Wooden wall: Fix hanging bar directly with screws, plugs are not needed.
Amount
5
5
1
- 7 -
Image

Advertisement

Table of Contents
loading

Table of Contents