Monthly Maintenance
Once a month, add the following to your weekly maintenance proce-
dure.
• Pull the developer, fixer and wash roller racks.
Inspect gears and roller surfaces for wear. Clean each rack with
warm water and a soft bristle brush. Rinse thoroughly. Check for
disfigured or swollen rollers.
• Clean drive shaft and worm gear.
Wipe away any dirt or dried up chemistry.
• Inspect the dry roller racks.
Check for contamination buildup. Clean rollers.
• Make sure that the circulation pumps are working.
• Inspect the processor.
Wipe up any dried chemistry, check hose connections for leaks, etc.
Avantra 20/25 OLP: Processor Operation • 9–27
Need help?
Do you have a question about the SelectSet Avantra and is the answer not in the manual?
Questions and answers