Operation Monitor - Mitsubishi G-50A Operating Manual

For mn converter & g-50a building air conditioning control system
Hide thumbs Also See for G-50A:
Table of Contents

Advertisement

4.3 Operation Monitor

* Items Performed Here
- Monitors and prints about the System Information and the Operating Data of units saved using the on-line
monitor.
4.3.1 Off-Line Analyzing
(1) Click on
Operation Monitor.
(2) Click on [Monitor Data] desired to be monitored.
(3) Click on
Notice: This covers the operation with the menu of the
right-clicking of the mouse.
(Refer to 4.6.6 Right-clicking menu.)
(4)
Operation Status Monitor Screen
(a) Click on the
data from one minute before or one minute after.
(b) "Menu Bar"
The
menu
[Time-Searching], [Help].
- Click on [Return] to end the Operation Status
Monitor Screen.
[Refer to (c)]
- Click on [Print] and then select "Print screen" from the
sub-menu.
The hard copy of the screen will be printed from the
connected printer.
.
- Click on [Time-Searching] and the Time Searching
Screen will appear.
Enter the [Date] and [Time].
(When entering the time, refer to the monitor data time.)
Once the time has been entered, click on
The entered data will appear.
If no time data has been entered, data for the nearest
time will appear.
Notice: Set the data/time to be entered to the time presented within the monitor data.
Setting to the time outside of the monitor time may cause to disable the search function.
to display the data list screen of
.
buttons to display
bar
displays
[Return],
[Print],
.
48
(b)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mn converterMaintenance tools

Table of Contents