Connecting 3-Phase Input Power - Miller Electric XMT 304 CC/CV Owner's Manual

Arc welding power source
Table of Contents

Advertisement

4-9. Connecting 3-Phase Input Power

4
3
6
Tools Needed:
3
= GND/PE Earth Ground
7
2
L1
L2
L3
1
!
!
!
For Three-Phase Operation
1
2
3
4
5
6
Connect green or green/yellow grounding
conductor to disconnect device grounding
terminal first.
Connect input conductors L1, L2, and L3
5
to disconnect device line terminals.
7
Select type and size of overcurrent protec-
tion using Section 4-8 (fused disconnect
switch shown).
Close and secure door on disconnect
device. Remove lockout/tagout device,
and place switch in the On position.
Installation must meet all National
and Local Codes − have only quali-
fied persons make this installation.
Disconnect and lockout/tagout in-
put power before connecting input
conductors from unit.
Always connect green or green/
yellow
conductor
to
supply
grounding terminal first, and never
to a line terminal.
Input Power Cord.
Disconnect Device (switch shown in
the OFF position)
Green Or Green/Yellow Grounding
Conductor
Disconnect Device Grounding
Terminal
Input Conductors (L1, L2 And L3)
Disconnect Device Line Terminals
Overcurrent Protection
2/04 - Ref. 802 136-A / 801 192
OM-233 045 Page 21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xmt 304 ccXmt 304 cv

Table of Contents