Download Print this page

Westerbeke 10TWO Technical Manual page 154

Marine
Hide thumbs Also See for 10TWO:

Advertisement

When
operated
electrically
by
use
of
the
preheat
switch
on
the
instrument panel, the fuel solenoid plunger should move smoothly and
rapidly into the solenoid with no binding or hesitation, drawing the
throttle arm into the run position .010 - .020 inches off the throttle
stop screw as the plunger bottoms in the fuel solenoid.
(NOTE:
The throttle arm stop screw is adj usted and wired/sealed at
the factory to allow the throttle arm to move to the proper no load
speed and voltage for the generator.
Further adjustment should not be
needed.
Tampering
with
this
stop
screw
without
proper
written
authorization may affect the generator's warranty.)

Advertisement

loading

This manual is also suitable for:

12b-two