For Proper Operation - NEC EcoPowerGateway N8142-36F User Manual

Table of Contents

Advertisement

FOR PROPER OPERATION

Observe the following notes for successful operation of the EcoPowerGateway. Use of the
EcoPowerGateway ignoring the notes will cause malfunctions or failures of the EcoPowerGateway.
EcoPowerGateway
Mount the EcoPowerGateway on a rack which can accept the EcoPowerGateway.
The socket-outlet shall be installed near the EcoPowerGateway and shall be easily
accessible.
Clear the dust adhering to the external surfaces of the EcoPowerGateway and the
ventilation hole of the power unit periodically. (See Chapter 5 for details.) Regular
cleaning proactively prevents various failures of the unit.
Always use the power cable dedicated to EcoPowerGateway to connect with the target
device.
Before connecting/disconnecting the cable to/from the peripherals, be sure to turn off the
POWER switch of the EcoPowerGateway.
Before turning off the power of EcoPowerGateway, make sure that all the devices
connected with the EcoPowerGateway are powered off.
After turning off the EcoPowerGateway and Maintenance card, wait for at least 30
seconds before turning on.
When you connect the target device with the EcoPowerGateway, wait for 30 seconds or
longer before turning on the DC output switch.
After disconnecting the power cable from the connector, wait for at least 30 seconds
before connecting it again.
Before relocating the EcoPowerGateway, turn off the power, and disconnect the power
cable from the connector.
Check and adjust the system clock before the operation if any of the following conditions
is applicable.
– After carriage of the EcoPowerGateway
– After storage of the EcoPowerGateway
– After the device is entered into the pause state under the environmental condition
enduring device operation (temperature: 10 to 40°C, humidity: 20 to 80%)
Check the system clock at the rough rate of once per month.
When the system clock is installed in a system requiring high time precision, it is
recommended to use a time server (NTP server).
If the system clock is remarkably delayed or advanced as the passage of time in spite of
adjustment, contact your service representative to ask maintenance.
Notes on Using Your EcoPowerGateway 1-17

Advertisement

Table of Contents
loading

Table of Contents