Procedures And Settings When Replacing The Slg Board - Toshiba e-STUDIO2330C Service Handbook

Multifunctional digital color systems
Hide thumbs Also See for e-STUDIO2330C:
Table of Contents

Advertisement

7.2.5

Procedures and settings when replacing the SLG board

When the SLG board has been replaced, make sure to follow the procedure below.
(1)
Confirm that the power is turned OFF.
(2)
Replace the SLG board.
SERVICE MANUAL "7.6.12 SLG board (SLG)"
(3)
Perform "Data transfer of characteristic value of scanner / SYS board -> SLG board (05-363)".
© 2008, 2009 TOSHIBA TEC CORPORATION All rights reserved
e-STUDIO2330C/2820C/2830C/3520C/3530C/4520C
7 - 23
REPLACEMENT OF PC BOARDS/HDD
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents