Note
Care should be taken not to scratch the white
surface of the boiler casing.
4.2.3 Using boiler template
• Fix the paper template to the wall ensure that the
template is vertical.
The template shows:
– The position of the fixing holes for the boiler mounting
bracket.
– The position of the connections.
– The position of the flue exit hole.
• Mark the position of the hanging bracket fixing holes.
• Drill 2 holes Ø 10 mm for the hanging bracket.
Note
Use alternative fixing holes where necessary.
Instructions for installation and servicing ecoTEC
Supplied By www.heating spares.co Tel. 0161 620 6677
Boiler installation sequence 4
5
60/100
A
A
Fig. 4.2 Assembly template
5
25
A
A
A
45°
450
19