Lincoln Electric RANGER 250 SVM150-A Service Manual page 77

Lincoln electric welder user manual
Table of Contents

Advertisement

F-27
FLASHING AND ROTOR VOLTAGE TEST (continued)
FIGURE F.9 – FIELD DIODE RECTIFIER BRIDGE AND FILTER CAPACITOR
4. Test rotor voltage - dynamic (engine run-
ning)
a. Remove the jumper used in the previous
step. Replace the spark plug wires, set
the RUN/STOP switch to RUN, start the
engine and run it at high idle speed
(3700 RPM).
b. Connect the positive meter probe to the
brush nearest the rotor lamination (leads
#200A and #200). See Figure F.8 for
location.
c. Connect the negative meter probe to the
other brush (leads #201 and #5H).
d. Carefully measure the voltage. It should
read approximately 46 - 52 VDC.
TROUBLESHOOTING & REPAIR
201
201A
9
FIELD
RECTIFIER
BRIDGE
RETAINING
TAB
CABLE
CAPACITOR
RANGER 250
7
200A
200B
5. If the voltage reading is low or not present,
the generator field is not functioning prop-
erly. Perform the Rotor Resistance Test.
Also check the field diode rectifier bridge,
filter capacitor, and associated leads and
connections. See Figure F.9 for location.
See the Wiring Diagram.
6. Check the rotor ground wire #5H for good
connection. See the Wiring Diagram.
7. If the rotor voltage readings are normal, the
field circuit is functioning properly.
8. If finished testing, perform the Case Cover
Replacement procedure.
F-27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ranger 250

Table of Contents