Antenna Lnb Replacement - KVH Industries TracVision C3 Owner's Manual

Kvh industries satellitetelevision owner's manual installation instructions user's guide technical manual tracvision c3
Hide thumbs Also See for TracVision C3:
Table of Contents

Advertisement

A Guide to TracVision C3
The LNB receives power from the
IRD via the RF Detector PCB. Be
certain that the IRD is disconnected
from its power source before
removing or reconnecting the LNB.
LNB Skew Angle Setting
(European systems only)
Skew Angles
LNB Clamp
& Wing Nut
5-8
Antenna Gyro Calibration
1. Connect a PC to the communications port as
described in
2. Type
ENTER key) while the system is performing the
limit switch initialization routine. The system will
complete the initialization function by finding the
azimuth and elevation switch limits and then go to
the home position.
3. Type
4. Type =CALGYRO<cr>. Verify that the Antenna
Gyro Azimuth scale factor is between -0.00090 and
-0.00110 and the Antenna Gyro Elevation scale
factor is between 0.00090 and 0.00110.
5. Type

5.4.4 Antenna LNB Replacement

Estimated Time to Repair:
In the event that the LNB experiences problems, it may be
necessary to replace it. To do so, use the following procedure:
1. (European systems only) Make a note of the current
LNB skew angle, pictured in Figure 5-7.
Figure 5-7
2. Disconnect the RF cable connector(s) at the LNB.
3. Remove the wing nut and washer from the LNB
clamp –
4. Remove the top of the LNB clamp and remove the
LNB
LNB.
5. Place the new LNB in the clamp and reattach the
Scribe
RF connector(s).
Mark
6. Replace the LNB clamp:
A. For North American LNBs, tighten the clamp
B. For European LNBs, do not fully tighten the
7. (European systems only) Carefully turn the LNB so
that the scribe mark is aligned with the skew angle
noted in Step 1. Fully tighten the clamp to
complete the replacement process.
Section 4.4, "Computer Diagnostics."
HALT<cr>
(<cr> indicates a carriage return/
DEBUGON<cr>
to enter Debug Mode.
ZAP
to restart/reinitialize the system.
1
hour
2
Fig.
5-3.
fully. The replacement process is complete.
clamp and proceed to Step 7.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents