Location; Clearances; Rigging Or Handling; Unit Center Of Gravity - York DNZ 024 Installation Manual

Single package gas/electric air-cooled air conditioners 2, 2-1/2, 3, 3-1/2, 4 and 5 nominal ton with r-410a refrigerant
Table of Contents

Advertisement

66433-YIM-B-1004

LOCATION

Use the following guidelines to select a suitable location for
these units.
1.
Unit is designed for outdoor installation only.
2.
Condenser must have an unlimited supply of air. Where
a choice of location is possible, position unit on either
north or east side of building.
Excessive exposure of this furnace to contami-
nated combustion air may result in equipment
damage or personal injury. Typical contaminates
include: permanent wave solution, chlorinated
washes and cleaners, chlorine based swimming
pool chemicals, water softening chemicals, carbon
tetrachloride, halogen type refrigerants, cleaning
solvents (e.g. perchloroethylene), printing inks,
paint removers, varnishes, hydrochloric acid,
cements and glues, antistatic fabric softeners for
clothes dryers, masonry acid washing materials.
3.
For ground level installation, a level pad or slab should
be used. The thickness and size of the pad or slab used
should meet local codes and unit weight. Do not tie the
slab to the building foundation.
4.
For roof top installation, be sure the structure will support
the weight of the unit plus any field installed components.
Unit must be installed on a level roof curb or appropriate
angle iron frame providing adequate support under the
compressor/condenser section.
5.
Maintain level tolerance of unit to 1/8" maximum.
Do not permit overhanging structures or shrubs to
obstruct the condenser air discharge, combustion
air inlet or vent outlet.

CLEARANCES

All units require certain clearances for proper operation and
service. Refer to Table 10 for the clearances required for
combustion, construction, servicing and proper unit opera-
tion.
Unitary Products Group

RIGGING OR HANDLING

Care must be exercised when moving the unit. Do not
remove any packaging until the unit is near the place of
installation. Rig unit with slings placed under the unit.
Spreader bars of sufficient length should be used across the
top of the unit.
Before lifting a unit, make sure that its weight is
distributed equally on the cables so that it will lift
evenly.
Units may also be moved or lifted with a fork-lift. Slotted
openings in the skid are provided for this purpose. Forks
must pass completely through the base.
Refer to Table 2 for unit weights and to Figure 1 for approxi-
mate center of gravity.
TABLE 2: UNIT WEIGHTS AND CENTER OF
GRAVITY
SHIPPING
OPERATING
UNIT
WEIGHT
WEIGHT
SIZE
(
.)
(
LBS
LBS
024
365
360
030
395
390
036
400
395
042
470
465
048
475
470
060
485
480
FRONT
OF
UNIT
"A"
49-1/8
25
FIGURE 1 - UNIT CENTER OF GRAVITY
CORNER WEIGHTS
(
,
.)
LOCATION
LBS
.)
"A"
"B"
"C"
91
88
89
98
95
96
100
96
98
131
129
101
133
130
102
136
133
105
"D"
CENTER OF
GRAVITY
"C"
47-1/4
"B"
25
"D"
92
99
101
103
104
107
5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dnz 030Dnz 036Dnz 042Dnz 048Dnz 060

Table of Contents