Slant/Fin EUTECTIC EC-13A Installation And Operating Instructions Manual

Oil-fired water boilers/no. 2 oil
Hide thumbs Also See for EUTECTIC EC-13A:

Advertisement

EUTECTIC EC-10
OIL-FIRED WATER BOILERS/NO. 2 OIL
INSTALLATION AND OPERATING INSTRUCTIONS
SAFETY WARNING:
KEEP BOILER AREA CLEAR AND FREE FROM COM-
BUSTIBLE MATERIALS, GASOLINE AND OTHER FLAMMA-
BLE VAPORS AND LIQUIDS. FAILURE TO ADHERE TO
ABOVE SAFETY WARNING, MAY RESULT IN PERSONAL
INJURY OR DEATH AND PROPERTY DAMAGE.
CONTENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .PAGE
Ratings and Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2
Installation Requirements:
Boiler Location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
Clearances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 & 4
Chimney Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
Air Supply and Venting . . . . . . . . . . . . . . . . . . . . . . . . . . .3-7
Controls and Accessories . . . . . . . . . . . . . . . . . . . . . . . . . .7
Piping for Water Units . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
Installing Burner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8
Oil Supply Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8
Wiring the Boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8
Vent Piping and Draft Regulator . . . . . . . . . . . . . . . . . . . . .8
Operating Instructions:
Precautions Before Starting . . . . . . . . . . . . . . . . . . . . . . . .8
Start-up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8
Cleaning and Filling New Water Boiler . . . . . . . . . . . . . . . .9
Extended Shutdown . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9
Freezing Protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10
Oil Burner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10
General Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . .10
Wiring Diagrams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11-13
Burner Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14-17
Appendix A-G . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .18-20
SERVICE COMPANY
Name_______________________________________________
Address _____________________________________________
____________________________________________________
Telephone ___________________________________________
Model #_____________________________________________
Serial # _____________________________________________
IMPORTANT: The installation of this equipment must conform
to the requirements of the authority having jurisdiction or, in
the absence of such requirements, to the Installation of Oil
Burning Equipment, CSA B139, latest edition. The installation
must also conform to the additional requirements in this
Slant/Fin Instruction Manual. Where there is any difference,
the more stringent requirement shall govern.
In addition, where required by the authority having juris dic -
tion, the installation must conform to American Society of
Mechanical Engineers Safety Code for Controls and Safety
Devices for Automatically Fired Boilers, No. CSD-1 or CSA
B149.1-00 for natural gas and propane. If there is any conflict
in the above requirements, then the more stringent require-
ment will apply.
THIS MANUAL MUST BE LEFT WITH OWNER AND SHOULD
BE HUNG ON OR ADJACENT TO THE BOILER FOR
REFERENCE.
IMPORTANT: This boiler must be installed, serviced and
repaired by a trained, experienced, service technician, licensed
for the installation and servicing of oil burning hot water heating
system equipment or otherwise qualified by the authorities hav-
ing jurisdiction over the installation.
Printed in Canada 6/10
Part No. 470900000
Publication No. EC-10-40
Rev. A
Rev. C

Advertisement

Table of Contents
loading

Summary of Contents for Slant/Fin EUTECTIC EC-13A

  • Page 1: Table Of Contents

    Care and Maintenance: Slant/Fin Instruction Manual. Where there is any difference, Extended Shutdown ......9 the more stringent requirement shall govern.
  • Page 2: Ratings And Dimensions

    1.15 (water). Gross capacity output is divided by the # All dimensions subject to normal manufacturing tolerance. allowance to obtain net rating. The Slant/Fin Technical Service department NOTE: All boilers under 87.9 kW (300,000 Btuh) input are tested and certified for should be consulted before selecting a boiler for unusual piping and pickup A.F.U.E.
  • Page 3: Boiler Location

    EUTECTIC EC-10 THE INSTALLATION INSTRUCTIONS IN THIS MANUAL ARE CHIMNEY REQUIREMENTS (see CSA B139, latest edition, ABBREVIATED. SEE THE FRONT COVER OF THIS MANUAL section 7) FOR REFERENCES TO CODES AND STANDARDS. A. The chimney must be constructed in accordance with all...
  • Page 5 EUTECTIC EC-10 In modern, weather stripped, energy-saving buildings or older See Table 2, “Provisions for Combustion and Ventilation Air buildings which have been modified similarly, natural infiltration Supply” for determining need and method of providing air for may not supply enough air for combustion, particularly if other combustion and ventilation.
  • Page 6 EUTECTIC EC-10 305 mm (12") MAX 305 mm (12") MAX 152 mm (6") MAX 152 mm (6") MAX Figure 3a. Figure 3b. Appliances located in confined spaces. Air from inside Appliances located in confined spaces. Air from out- the building. See Table 2 (2.3).
  • Page 7: Controls And Accessories

    EUTECTIC EC-10 The opening size recommendation just given is for guidance B. CONVENTIONAL COMPRESSION TANKS (non- only. It is the installer’s responsibility to provide air for combus- diaphragm type) are used to control system pressure in tion and ventilation to all appliances, under all operating condi- an AIR COLLECTING SYSTEM.
  • Page 8: Installing Burner

    B. Vent pipes and breeching must be pitched upward a mini- DOMESTIC HOT WATER mum of 20mm/m (1/4" per foot). For Indirect-fired storage water heater application, see Slant/Fin C. Connect vent pipe to the chimney using as few elbows as publication HWT-10A and Installation manual HWT-40. The...
  • Page 9: Cleaning And Filling New Water Boiler

    EUTECTIC EC-10 F. Once burner and draft have been set up, then smoke, CO Provide corrosion protection conditioning to the boiler and stack temperature should be checked and recorded. If water in the heating system. There are a number of...
  • Page 10: Freezing Protection

    EUTECTIC EC-10 plastic half of the connector closest to the flexible III. OIL BURNER conduit and gently pulling it in the direction of the All service to the oil burner, oil filter, oil strainer, etc., should conduit until it is disconnected. Remove all four be performed by a professionally trained service person.
  • Page 11: Wiring Diagrams

    EUTECTIC EC-10...
  • Page 12 EUTECTIC EC-10 Honeywell L 7248C –1030 Aquastat Control Multiple Zoned (Circulator or Zone Valve) Honeywell L 7248C –Single Zone or Riello Burner...
  • Page 13 EUTECTIC EC-10 Honeywell L7248L with SF-10 Control...
  • Page 14: Burner Data

    EUTECTIC EC-10 BURNER DATA—BECKETT BURNERS FOR PACKAGED BOILERS ONLY Nozzles Firing Rate Oil Pump Approx. Approx. Approx. Boiler Burner Blast Size Angle & Head Air Shutter Air Band Model Model Tube MFR. L/hr. L/hr. GPH Type (PSIG) Setting † Setting †...
  • Page 15 EUTECTIC EC-10 Check/Adjust “Z” Dimension – L1 & L2 Heads Figure 9. Head Adjustment L1 & L2 Beckett Head 1. See figure above. The important “Z” dimension is the distance from the leading edge of the head to the end of the air tube. This distance for L1 and L2 heads is 35mm (1-3/8”) if the tube has a straight shroud or 44mm (1-3/4”) if the air tube has a conic shroud.
  • Page 16 EUTECTIC EC-10 BURNER DATA - RIELLO BURNERS FOR PACKAGED BOILERS ONLY (RIELLO R-40 SERIES W/SHORT TUBE) Nozzles Firing Rate Oil Pump Approx. Approx. Boiler Burner Blast Head Size Angle & Model Model Tube MFR. L/hr (PSIG) Setting † Setting †...
  • Page 17 EUTECTIC EC-10 BURNER DATA - RIELLO (continued) 1. Regulation of the combustion air flow is made by adjustment the manual AIR ADJUSTMENT PLATE after loosening the REGULATION OF THE TURBULATOR AND AIR SHUTTER FOR FIXING SCREWS & . The initial setting of the air adjustment PROPER COMBUSTION plate should be made according to figure 13.
  • Page 18 USE OF NON-OXYGEN DIFFUSION BARRIER UNDERFLOOR TUBING The boiler warranty does not cover leaks resulting from corrosion Slant/Fin recommends the use of underfloor plastic tubing with an caused by the use of underfloor plastic tubing without an oxygen oxygen diffusion barrier. Other system components may also diffusion barrier.
  • Page 19 EUTECTIC EC-10 APPENDIX D WATER QUALITY Recent investigations of boilers which were installed in hard water 2. The initial water charge of the system must be treated to reduce areas, revealed that mineral deposits had accumulated at the its hardness to an acceptable level.
  • Page 20 13 mm bolts on the cast iron hinge pin. ©Slant/Fin Corp. 2007. SLANT/FIN LTD/LTEE, 6450 Northam Drive, Mississauga, Ontario L4V 1H9 • Phone: (905) 677-8400 / FAX: (905) 677-1829 Order Desk Fax: (905) 677-9015 www.slantcan.ca / E-mail: orderdesk@slantfin.ca info@slantfin.ca...

Table of Contents