Handing Over To The User; Servicing; Initial Inspection; Cleaning The Burner And Primary Heat - Vaillant 824/2 E Instructions For Installation Manual

Turbomax plus and thermocompact wall hung room sealed fan assisted combination and system boilers
Table of Contents

Advertisement

Fig. 8.4: Pump speed

8.5 Handing over to the user

• Set the maximum radiator temperature control to the
desired setting.
• Set the maximum hot water temperature control to
the desired setting.
• Instruct the user in the safe and efficient operation of
the boiler, in particular the function of:
-
The boiler on/off control
-
The maximum radiator temperature control
-
The maximum hot water temperature control
( ( t t u u r r b b o o M M A A X X p p l l u u s s o o n n l l y y ) )
-
The pressure gauge
• Show the user how to operate any external controls.
• Explain to the user the importance of having the
boiler regularly serviced by a competent servicing
company. To ensure regular servicing, it is strongly
recommended that arrangements are made for a
Maintenance Agreement. Please contact Vaillant
Service Solutions (0870 6060 777) for further details.
• Ensure the boiler log book is fully completed and leave
with the end user. Failure to install and commission
this appliance to the manufacturers instructions may
invaludate the warranty (Note: This does not affect
your statutory rights).
• Leave the user instructions, the boiler log book and
the installation and servicing instructions with the
user.
Instructions for Installation and Servicing turboMAX plus and thermoCOMPACT R1
Supplied By www.heating spares.co Tel. 0161 620 6677
Functional Checks (Commissioning Part III) 8

9 Servicing

9.1 Initial Inspection

To ensure the continued safe and efficient operation of
the boiler it is recommended that it is checked and
1
serviced as necessary at regular intervals. The
frequency of servicing will depend upon the particular
installation conditions and usage, but in general once
per year should be adequate. It is the law that all servic-
ing work is carried out by a competent person (Corgi
registered).
• Isolate the mains electricity supply by disconnecting
the plug at the socket outlet (if there is only an
isolating switch remove the fuse from the switch).
• Turn OFF the gas supply at the gas service valve fitted
to the boiler.
• Always test for gas soundness and always carry out
functional checks after any service work and after
exchanging any gas carrying component.
• Always check earth continuity, polarity and resistance
to earth with a multimeter after any service work and
after exchanging any electrical component.
Before commencing any servicing or maintenance work,
carry out an initial inspection of the system as follows:
• Inspect the flue, pipework and electrical connections
for indications of damage or deterioration.
• Inspect the air supply and ventilation arrangements of
the installation.
• Check the heating and water system, in particular the
condition of radiator valves, evidence of leakage from
the heating system and dripping hot water taps.
Functional check of boiler operation
• Carry out a functional check of the boiler operation as
prevoiusly detailed.
• Remove the appliance casing as detailed and operate
the boiler by fully opening a hot water tap. Inspect the
burner operation through the viewing window. Check
that the flames are evenly covering the surface of the
burner. Inspect for signs of excessive flame lift or
sooting.
9.2 Cleaning the burner and primary heat exchanger
• Turn off the boiler.
• Isolate the electrical supply to the boiler.
• Remove the boiler case as described.
• Turn off the gas service valve.
Improtant!
Before starting any maintenance work:
Note!
The boiler is fitted with a combustion analysis
test points on the front of the combustion
chamber cover. A suitable combustion analyser
can be connected to these points to establish
the combustion performance of the boiler.