Side Shelf Handle Assembly & Battery; Battery Installation - Jenn-Air 720-0163 Use And Care Manual

Stainless steel lp gas grill
Table of Contents

Advertisement

SIDE SHELF HANDLE ASSEMBLY
Estimated Assembly Time: Approximately 5-7 minutes
Required Tools: Phillips Screwdriver
1. Remove the four side shelf handle screws from the side of the shelf.
2. Align the holes in the side shelf handle with the holes in the side shelf.
3. Insert the screws and tighten.

BATTERY INSTALLATION

1. Remove the ignition button housing.
2. Insert the battery into the housing with the positive terminal facing outward.
3. Replace the ignition button housing after the battery has been installed.
8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents