Download Print this page
Greenheck SEFSD Series Installation Instructions
Greenheck SEFSD Series Installation Instructions

Greenheck SEFSD Series Installation Instructions

Greenheck fire smoke dampers installation instructions
Hide thumbs Also See for SEFSD Series:

Advertisement

Quick Links

Steps to install an RRL/OCI in a Fire Smoke Damper:
1) Drill/saw a 3 5/8 in. (92mm) diameter hole in sleeve
(Detail 2).
2) Attach indicator bracket to blade. For an airfoil
blade dampers, use existing holes in blade (Detail
1-A). For a 3V blade damper, drill two 0.166
in. (4mm) holes (Detail 1-B). Fasten bracket to
bladewith #10 x 1/2 in. (13mm) TEK screws (or
equilavent).
3) Fit indicator link into blade bracket (Detail 1-C).
4) Insert RRL/OCI unit through hoel in sleeve (round
end inside).
Detail 1
Upturned Leg Faces
Away Fr o m Blade End
#10 x 1/2 in. T ek Screw
or Equivelant
Part No. 415555
2 Req'd
A
Airfoil Blade
Indicator
Link
C
Note: Indicator Link Part Nos
For Standard Sleeve (short): 457808
For Extended Sleeve (long): 457801
Indicator Bracket
Part No. 658594
1 Req'd
Upturned Leg
Faces Away From
Blade End
#10 x 1/2 in. Tek
or Equivelant
Part No. 415555
2 Req'd
B
0.166 in. dia.
2 Places
Indicator
Bracket
.
for RRL/OCI
on FSD, SEFSD, SSFSD series
for RRL/OCI field kit (part numbers
5) Place 4 in. x 4 in. J-box over the flange of the
RRL/OCI unit and align holes.
6) Mount control box to sleeve/sideplate with
#10-16 x 3/4 in. (19mm) TEK screw or equilavent
(Detail 1-D).
7) Place one pushnut on the switch wire. Place
indicator link on switch wire and secure with a
second pushnut (Detail 1-D).
8) Complete wiring and install J-box cover.
RRL/OCI - Exploded View
Screw
Indicator Bracket
Part No. 658594
1 Req' d
1.750
3-V Blade
Part Number 471836

Installation Instructions

(Resettable/Reusable
Link with Open/Close Indicator)
852291 & 822468)
D
Gasket
1 Req'd
Push Nuts
2 Req'd
Indicator Link
(short or long; see C)
1 Req'd
#10-16 x 3/4 in .
SIHWH Screw
2 Req'd
J-Box Cover
1 Req'd
J-Box
1 Req'd
RRL/OCI
1 Req'd

Advertisement

loading

Summary of Contents for Greenheck SEFSD Series

  • Page 1: Installation Instructions

    Steps to install an RRL/OCI in a Fire Smoke Damper: 1) Drill/saw a 3 5/8 in. (92mm) diameter hole in sleeve (Detail 2). 2) Attach indicator bracket to blade. For an airfoil blade dampers, use existing holes in blade (Detail 1-A).
  • Page 2: Wiring Diagram

    Electrical Capacity = 10 AMP (max) Optional Momentary Contact Test Switch Black Black By Others Yellow Yellow Yellow Yellow Copyright © 2008 Greenheck Fan Corporation RRL/OCI Rev 1 July 2008 White Electric Damper Actuator or Pneu. Solenoid Valve Damper Indicator LIghts...

This manual is also suitable for:

Ssfsd series