Outdoor Unit: 2MXS18GVJU
1.3
Removal of PCBs
Procedure
Step
1
Remove the screw of the
main PCB, and unfasten
the 2 hooks.
2
Unfasten the hook of the
terminal board, and open
the terminal board.
3
Disconnect each
connector [S11] [HE] [HL]
[HN] on the back of the
terminal board.
4
Disconnect the
connectors [S52] [S102]
from the service monitor
PCB.
209
Warning
Be sure to wait for 10 minutes or more after turning off all power supplies
before disassembling work.
Procedure
Base bar
[S52]
Main PCB
(R2177)
[HE]
[HL] [HN]
[S11]
(R17403)
[S102]
Service monitor PCB
(R17347)
SiUS12-928_B
Points
When reassembling, insert
the base bar into the hole of
the main PCB.
Hook
(R2178)
Removal Procedure