Maintenance
Level 1
Tasks
Recom-
mended
to be done
monthly/
10 hrs.
1. Disable the unit
from operating
per the first page
warning.
2. Check the engine
oil level. Adjust
as necessary.
3. Check the engine
coolant level.
Adjust as
necessary.
4. Check the engine
coolant thermal
protection level.
Correct as
necessary.
5. Check the natural
gas delivery
system for leaks
and correct
pressure on gas
engine driven
units. Tighten
connections as
necessary.
6. Check the air
inlets and outlets
for debris. Clean
as necessary.
7. Check the battery
electrolyte level
and specific
gravity if
accessible. Adjust
as necessary.
8. Check the battery
posts, cables,
and charger for
loose
connections,
corrosion, and
proper operation.
Correct as
necessary.
9. Check the unit
wiring for loose
connections,
corrosion, and
damage. Correct
as necessary.
09/05
A
Rev.
SrvSchd001
Standby Generator Sets
Service Schedule
Level 2
Task
Required
Task
Comp. to be done Comp. to be done
(Date-
3 months/
(Date-
Initials)
Break-in
Initials)
30 hrs.
Level 3
Required
Task
Comp.
Semi-
(Date-
to be done
annually/
Initials)
50 hrs.
11-2
Level 4
Level5
Task
Required
Required
Comp.
to be done
(Date-
Bi-
Annually/
Initials)
annually/
100 hrs.
250 hrs.
Task
Comp.
(Date-
Initials)