Generac Power Systems 20kW Owner's Manual page 22

1.5l 20kw standby generator
Hide thumbs Also See for 20kW:
Table of Contents

Advertisement

Maintenance
Tasks
13. Initiate an automatic start
and transfer of the unit to
site load and exercise it for
at least 1 hour looking for
leaks, loose connections
or components, and
abnormal operating
conditions. Correct as
necessary.
14. Start and exercise the unit
at full rated load (use a
load bank if the site load is
not enough) for at least 2
hours looking for leaks,
loose connections or
components, and abnormal
operating conditions.
Correct as necessary.
15. Change the engine oil.
16. Replace the engine oil
filter(s).
17. Replace the engine air
filter(s).
18. Replace the engine fuel
filter(s) on diesel engine
driven units and re-prime
the fuel system.
19. Check the engine spark
plugs on gas engine driven
units. Clean and re-gap or
replace as necessary.
20. Perform a 5 minute no-load
operational run of the unit
looking for any post service
problems.
21. Return the unit to standby
setup for operation when
required.
Standby Generator Sets
Service Schedule
Level 1
Recom-
Task
mended
Comp.
to be done
to be done
(Date-
3 months/
monthly
Initials)
Level 2
Level 3
Required
Task
Required
Comp.
to be done
(Date-
Break-in
Initials)
annually
11-3
Level 4
Task
Comp.
Required
Semi-
(Date-
to be done
Initials)
Annually
Task
Comp.
(Date-
Initials)
09/05
A
Rev.
SrvSchd002