g
AUTOMATIC BYPASS
ENABLED
SERVICE WARNING
DISABLED
5.4

Test Screens

These screens show the test procedure, either started from the service menu (front panel keys) or via the UPS
monitoring software (RS232/SNMP). The upper line indicates the kind of test, the second line its status.
Upper lines:
GENERAL SYSTEM
GENERAL SYSTEM
GENERAL SYSTEM
GENERAL SYSTEM
QUICK BATTERY
QUICK BATTERY
QUICK BATTERY
QUICK BATTERY
CALIBRATE BAT
CALIBRATE BAT
CALIBRATE BAT
CALIBRATE BAT
BYPASS
BYPASS
BYPASS
BYPASS

5.4.1 Battery Test, general

Automatic test: Every 500 operating hours the UPS conducts automatic battery tests to ensure that the
batteries and the wiring are able to support power failures. The tests do not cause any interruption in the
functioning of the unit.
Manual test: A manual battery test can be activated
-
either through an interface kit, via the RS232 or SNMP Interface Port (please refer to the manual of
your interface package), or
-
via the front panel: see below

5.4.2 Quick Battery Test

From the standard menu first enter the service menu (press the 'down' and 'Enter/Reset' keys simultaneously,
then press the 'down' key until the following screen appears:
QUICK BATTERY
TEST PRESS ENTER
The 'Enter/Reset' key confirms the selection, and the screen shows:
QUICK BATTERY
TEST START
The test status (indicated by the second line) can be:
TEST ACTIVATED
TEST ACTIVATED
TEST ACTIVATED
TEST ACTIVATED
TEST SUCCESSFUL
TEST SUCCESSFUL
TEST SUCCESSFUL
TEST SUCCESSFUL
TEST FAILED
TEST FAILED
TEST FAILED
TEST FAILED
NOT AVAILABLE
NOT AVAILABLE
NOT AVAILABLE
NOT AVAILABLE
If the batteries are dangerously close to being worn out, a low priority alarm 'replace battery' will be generated.
The batteries must be replaced as soon as possible (see section 8.3).
NOTE: If the manual test is started immediately after installation or after a power failure, the UPS may generate
a false 'replace battery' alarm as the batteries have been (partly) discharged during transport/storage or during
the power failure.
LX: OPM_LPU_11U_5K0_10K_1US_V030
Controls
functioning
ENABLED/DISABLED. If the UPS is used as a frequency converter you may
change the setting to 'DISABLED'. Bypass operation will then be inhibited and
all alarms related to 'bypass out of limits' are suppressed.
The system can prompt for service to a user defined schedule.
Range: 8/12/16/20/24/28 months or DISABLED. To reset the timer: first select
"DISABLED" and subsequently set a new alarm interval.
second line:
TEST START
TEST START
TEST START
TEST START
TEST ACTIVATED
TEST ACTIVATED
TEST ACTIVATED
TEST ACTIVATED
TEST SUCCESFUL
TEST SUCCESFUL
TEST SUCCESFUL
TEST SUCCESFUL
TEST FAILED
TEST FAILED
TEST FAILED
TEST FAILED
=
testing
=
battery has been tested with positive result
=
the batteries should be replaced
=
battery capacity too low to start the test
Digital Energy
of
the
automatic
the test will start soon
the test is running
the test has been completed succesfully
the test has not been completed succesfully
31
GE DE LP 11U UPS: Installation / User Manual 3.0 (US)
LP Series
bypass
switch.
Range:

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents