The Refrigerator - Samsung RS27FDBTNSR User Manual

User manual ver.0.2 (english, french, spanish)
Hide thumbs Also See for RS27FDBTNSR:
Table of Contents

Advertisement

Available languages

Available languages

3. Connect the water line installation kit to the
shut off valve.
Cold water line
Pipe clamp
Shut off valve
Connecting the water supply line to

the refrigerator.

There are several items that you need to purchase
to complete this connection.
You may find these items sold as a kit at your local
hardware store.
Use Copper Tubing
• ¼" copper tubing
• ¼" compression nut
(1pc)
• Ferrule (2pc)
Refrigerator
Compression Nut
(1/4") (Assembled)
Ferrule
(Not supplied)
Copper tubing
(Not supplied)
Household water supply line
DA68-02935A-02.indb 21
Water line installation kit
Use Plastic Tubing
• ¼" plastic tubing
→ Molded end (Bulb)
• ¼" compression nut
(1pc)
Plastic Tubing
(Assembled)
Compression
Fitting (Assembled)
Molded end
(Bulb)
Compression
nut (B) (1/4")
(Not supplied)
Plastic tubing (B)
or
(Not supplied)
1. Connect the household water line to the
assembled compression fitting.
- If you are using copper tubing, slip the
compression nut ( B ) (not supplied) and
ferrule (not supplied) on the copper tubing (not
supplied) as shown.
- If you are using plastic tubing ( B ) , insert the
molded end (Bulb) of the plastic tubing ( B ) into
the compression fitting.
Do not use without the molded end (Bulb)
of the plastic tubing ( B ).
CAUTION
2. Tighten the compression nut ( B ) onto the
compression fitting.
Do not over-tighten the compression nut ( B ) .
3. Turn the water on and check for any leakage.
If you find water drops or leakage in the
connection areas, turn off the main water
supply. Check the connections and, if
necessary, tighten.
4. Flush 1 gallon of water through the filter before
drinking or using the water from the refrigerator.
(Flush approximately 6 minutes.) To flush, press
a large glass or cup against the water dispenser
lever. Fill the glass, empty it into the kitchen sink
after it is filled, and then repeat.
5. After you turn on the refrigerator, let the ice
maker make ice for 1 to 2 days. Over that
period of time, throw out the first 1 or 2 buckets
of ice the freezer makes to ensure all impurities
have been removed from the water line.
Only connect the water line to a drinkable
water source.
If you have to repair or disassemble the water line,
cut off 1/4" of the plastic tubing to make sure you
get a snug, leak-free connection.
You can test the water line quickly using a
paper cup. Under normal conditions, the
water dispenser can fill a 5.75 oz. (170 cc)
cup in about 10 seconds.
setting up _21
13. 8. 28.
9:10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents