Follow these steps to install the 2911 Air Converter:
Step 1
Remove the screws (three on top and three at the bottom) of the 2911 Air Converter. See
Note
OL-18712-03
Back View of the Cisco 2911 Router with the 2911 Air Converter
Front View of the Cisco 2911 Router Showing Forced Front-to-Back Air Flow Scheme
Set aside these six screws for joining the inner and outer piece in