Performs the initial diagnosis on all the PSB that are mounted.
EXAMPLE 3
testsb -c all
XSCF>
Initial diagnosis is about to start. Continue? [y|n] :
SB power on sequence started.
0end
Initial diagnosis started. [1800sec]
0..... 30..... 60..... 90.....120end
Initial diagnosis has completed.
SB power off sequence started. [1200sec]
0.end
SB powered off.
XSB
Test
Fault
---- ------- --------
00-0 Passed
Normal
01-0 Passed
Normal
02-0 Passed
Normal
03-0 Passed
Normal
Ignores the settings for the warm-up time of the system and the wait time be-
EXAMPLE 4
fore system startup to perform the initial diagnosis on the PSB that are
mounted.
testsb -c all
XSCF>
Initial diagnosis is about to start. Continue? [y|n] :
Ignore warmup-time and air-conditioner-wait-time, Continue?[y|n] :
SB power on sequence started.
0end
Initial diagnosis started. [1800sec]
0..... 30..... 60..... 90.....120end
Initial diagnosis has completed.
SB power off sequence started. [1200sec]
0.end
SB powered off.
XSB
Test
Fault
---- ------- --------
testsb(8)
y
y
y
System Administration