Section 2 Operation
2.1
Prestart Checklist
To ensure continued satisfactory operation, perform the
following
checks
or inspections
before
or at each
startup, as designated, and at the intervals specified in
the service schedule.
In addition, some checks require
verification after the unit starts.
Air Cleaner. Check for a clean and installed air cleaner
element to prevent unfiltered
air from entering the
engine.
Air Inlets. Check for clean and unobstructed air inlets.
Battery. Check for tight battery connections.
Consult
the
battery
manufacturer's
instructions
regarding
battery care and maintenance.
Exhaust
System.
Check
for exhaust
leaks and
blockages.
Check the muffler and piping condition and
check for tight exhaust system connections.
Inspect the exhaust
system
components
(exhaust
manifold, exhaust line, flexible exhaust, clamps, muffler,
and outlet pipe) for cracks, leaks, and corrosion.
• Check for corroded or broken metal parts and replace
them as needed.
• Check for loose, corroded, or missing clamps and
hangers.
Tighten or replace the exhaust clamps
and/or hangers as needed.
• Check that the exhaust outlet is unobstructed.
• Visually inspect for exhaust leaks (blowby).
Check
for carbon or soot residue on exhaust components.
Carbon and soot residue indicates an exhaust leak.
Seal leaks as needed.
Oil Level. Maintain the oil level at or near, not over, the
full mark on the dipstick.
Operating
Area.
Check for obstructions
that could
block the flow of cooling air. Keep the air intake area
clean. Do not leave rags, tools, or debris on or near the
generator set.
x:op:001:002
2.2
Exercising
the Generator
Set
Operate the generator set under load once each week
for one hour.
If the generator set does not have a
programmed exercise mode or an automatic transfer
switch (ATS) with an exercise option, exercise the unit in
the presence of an operator.
During the exercise period apply a minimum of 35% load
based on the nameplate standby rating.
The operator should perform all of the prestart checks
before starting
the exercise
procedure.
Start the
generator set according to the starting procedure in the
controller section of this manual.
While the generator
set is operating, listen for a smooth-running engine and
visually inspect the generator set for fluid or exhaust
leaks. Check the air inlets and outlets and remove any
items restricting the air flow.
2.3
Generator
Set Operation
Figure 2-1 illustrates the user interface on the Advanced
Digital Control (ADC 2100) generator set controller.
2_
\
\
_'ED
D_T_. _
COnE
nEFImTION
_,_
A_JII i
_ull
Cmn_l*
Hn
Hlgll
_ "a11_Ip
He
Hlllh_en I_ lllmp
L_L
LOW 4_1411mn4 Lllt_
LOC
LU= of CNMn=
LOp
LOW G41Ll_'lOFJr4p
C4_
_r
Ct, lnk
= _; ."',..?='
uU_
Oser voltep
Under _u*_'i,
_FmSllmr
RUN
_
AU'TO
o
o
x
4
J
GM28707A-C
1. LED display
2. Select button (use for setup and adjustment
only)
3, Up and down arrow buttons (use for setup and adjustment
only)
4, Generator set master switch
Figure 2-1
ADC 2100 Controller User Interface
TP-6195
1/04
Section 2 Operation
3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

8.5res

Table of Contents