Installation Codes And Standards; Assembly - Vulcan-Hart VEC3018 ML-126198 Installation & Operation Manual

Vec series electric conveyor ovens
Table of Contents

Advertisement

When installed, minimum clearance from combustible and non-combustible construction must be
2.5" (63.5 mm) at the sides and 2.5" (63.5 mm) at the rear.
The installation location must allow adequate clearances for servicing and proper operation.
A minimum front clearance of 36" (914.4 mm) is required.
Information on the construction and installation of ventilating hoods may be obtained from the
standard for "Vapor Removal from Cooking Equipment," NFPA No. 96 (latest edition), available from
the National Fire Protection Association, Batterymarch Park, Quincy, MA 02269.
Exhaust: Approximately 2000 CFM required for double stacked ovens.
Approximately 1500 CFM required for single oven.
Make-up air should be 65% to 80% of the exhaust air rating.

INSTALLATION CODES AND STANDARDS

The oven must be installed in accordance with:
In the United States of America:
1. State and local codes.
2. National Electrical Code, ANSI/NFPA-70 (latest edition). Copies may be obtained from The
National Fire Protection Association, Batterymarch Park, Quincy, MA 02269.
In Canada:
1. Local codes.
2. Canadian Electrical Code, CSA C22.2 No. 3 (latest edition). Copies may be obtained from The
Canadian Standard Association, 178 Rexdale Blvd., Etobicoke, Ontario, Canada M9W 1R3.

ASSEMBLY

Ovens Mounted On Casters
Separate instructions for installing casters to the oven are included with the casters.
Installing Basic Oven
1. Attach front legs by screwing them into the bottom of the oven.
2. Tilt oven forward resting it on the front legs.
3. Lift oven from the rear.
4. Attach back legs once oven is lifted.
5. Place oven in its operating position.
— 4 —

Advertisement

Table of Contents
loading

Table of Contents