Performance Verification (Pv) Test; Pv Test Sequence - Furuno FELCOM 16 Operator's Manual

Inmarsat mini-c mobile earth station
Hide thumbs Also See for FELCOM 16:
Table of Contents

Advertisement

7. MAINTENANCE, TROUBLESHOOTING
7.3

Performance Verification (PV) Test

After the FELCOM 16 is installed, the installer usually confirms that it is
functioning properly, by logging in and conducting the PV test. This test consists
of the receiving a test message from an LES, transmitting a message to an LES
and a distress alert test.
The results of the test appear on the PV test result display.
The PV test cannot be conducted from an auxiliary terminal unit. Note that the
test can also be initiated by an NCS.
7.3.1

PV test sequence

1. Choose PV Test from the Test menu.
2. The MES requests an NCS to conduct the PV test.
3. NCS acknowledges request for testing.
4. The MES, upon receiving acknowledgment from NCS, goes into pending
state.
5. NCS will choose an LES to perform the test.
6. The LES transmits a test message to the MES.
7. The MES transmits a test message to the LES.
8. The LES receives test message.
9. The MES automatically transmits the distress alert test within two minutes
after completion of step 8.
10. When the distress alert test is finished, the LES sends the results of the PV
test to the MES.
7-4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents