Note – When replacing the motherboard unit, attach connection destination labels
to each of the LAN cable and UPS cable connected to the XSCF unit before removing
these cables.
Note – When mounting the motherboard unit, connect the LAN cable and UPS
cable to the XSCF unit.
Note – After the replacement of the motherboard unit is completed, the system
clock must be reset. For details of the setting method, see the SPARC Enterprise
M3000/M4000/M5000/M8000/M9000 Servers XSCF User's Guide.
Note – After the replacement of the motherboard unit is completed, the versions of
the XCP and Oracle Solaris OS must be checked. For details of version number
checking and other such tasks, see the SPARC Enterprise
M3000/M4000/M5000/M8000/M9000 Servers XSCF User's Guide.
Note – To activate a hardware RAID boot volume after replacing the MBU of an
M3000 server with SPARC64 VII+ processors, see
Appendix
F.
Because the XSCF unit is mounted on the motherboard unit, it cannot be replaced
singly. For details of the XSCF unit, see the
Appendix
B.2.4.
6-2
SPARC Enterprise M3000 Server Service Manual • March 2012