Optional Blower Installation Instructions - Empire Heating Systems DV-35-2SG Installation Instructions And Owner's Manual

Direct vent wall furnace
Table of Contents

Advertisement

OPTIONAL BLOWER INSTALLATION INSTRUCTIONS (continued)
Cleaning
The blower wheel will collect lint and could require cleaning once
a year. If the air output decreases or the noise level increases,
it indicates a dirty wheel. Complete removal of the wheel and
scrubbing it with a brush under flowing water is recommended.
Oiling
The blower motor has an oil hole located on each end of the motor.
Use #20 motor oil only. It is best to oil the motor several times
during the heating season using 2 or 3 drops each time. If the motor
fails to start and hums, it could be a tight bearing due to lack of
oil. This may be corrected by pouring kerosene in the oil holes,
allowing to stand for a few hours and then oiling properly.
3
4
2
1
11
12
PARTS LIST
Index
Part
Description
No.
No.
1
R-2090
Motor
2
632016
Motor Cushion
3
RH-036
Motor Support
4
642030
Blower Wheel
5
RH-710
Blower Housing Assembly
6
9120106
Fan Control Switch
7
872087
Heyco Bushing
8
DV-806
Switch Box
9
DV-807
Switch Box Cover
10
R-2091
Wire Assembly 19" (483mm)
11
8720161
Heyco Bushing
12
R-2099
Cord Set 72" (1.83m)
12434-9-0107
7
6
5
8
9
10
Page 17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dv-25-2sg

Table of Contents