Installing The Su-I; Installation Requirements - Alvarion BreezeACCESS VL System Manual

Hide thumbs Also See for BreezeACCESS VL:
Table of Contents

Advertisement

Chapter 2 - Installation
2.5

Installing the SU-I

The following sections describe how to install the SU-I CPE.
2.5.1

Installation Requirements

2.5.1.1
Packing List
SU-I CPE
Power Adapter
3 meters Ethernet Cable
Wall/window mountable detached antenna kit, including wall/window
mounting accessories and a 2 meters SMA-SMA (M/M) RF cable (only with
SU-I-D).
2.5.1.2
Additional/Optional Items
Mains plug adapter or termination plug (if the power plug on the power
adapter not fit local power outlets. The Power Adapter is supplied with a North
American power plug and an EU power connector adapter).
Portable PC with an Ethernet card and a straight Ethernet cable for
configuring parameters using either Telnet or AlvariCRAFT for BreezeACCESS
VL application. TFTP server SW is required for downloading SW versions.
Other installation tools and materials (means for securing cables to walls,
etc.).
NOTE
Items marked with an asterisk (*) are available from Alvarion.
54
BreezeACCESS VL System Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents