HP DL360 - ProLiant - G3 Setup And Installation Manual page 49

Hp proliant dl360 generation 3 server setup and installation guide
Hide thumbs Also See for DL360 - ProLiant - G3:
Table of Contents

Advertisement

Server Installation
3. Carefully align the two front tabs on the front of the universal rack rail with the
holes identified at the front of the rack.
4. Insert the front tabs of the universal rack rail into the rack.
Figure 3-3: Aligning and inserting the universal rack rail
5. Compress the universal rail rack toward the front of the rack until the rear tabs
are aligned with the inner holes at the back of the rack.
NOTE: Adjust the depth of the rack rail to match the rack model by using the rack depth
indicators on the rail.
6. Insert the rear tabs into the rear holes, and release the rail. The rail should lock in
place securely.
7. Repeat steps 2 through 6 for the second universal rack rail.
3-4
HP ProLiant DL360 Generation 3 Server Setup and Installation Guide

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant dl360 g3

Table of Contents