Converting Hot-Plug Power Supply Bay 2 - HP DL360 - ProLiant - G3 Setup And Installation Manual

Hp proliant dl360 generation 3 server setup and installation guide
Hide thumbs Also See for DL360 - ProLiant - G3:
Table of Contents

Advertisement

Installing Hardware Options
When a single hot-plug power supply is being replaced, or when converting from
hot-plug AC to DC or DC to AC power supplies, the server must be powered
down before replacing the hot-plug power supply.
When adding a second power supply, the server must first be configured for
hot-plug power redundancy by removing the PCI riser board in PCI slot 2. Refer
to the following section and to the documentation that shipped with the server.

Converting Hot-Plug Power Supply Bay 2

WARNING: To reduce the risk of personal injury from hot surfaces, allow the
power supply or power supply blank to cool before touching it.
CAUTION: To prevent improper cooling and thermal damage, do not operate the
server unless all bays are populated with either a component or a blank.
1. Power down the server, remove from the rack and remove the access panel. Refer
to the documentation that shipped with the server.
2. Disconnect any cables leading from an expansion board in PCI riser board 2 and
remove the expansion board and expansion board assembly. See previous
procedure.
NOTE: The PCI riser board removed from PCI slot 2, and any existing expansion board, can
be retained for future use.
2-20
HP ProLiant DL360 Generation 3 Server Setup and Installation Guide

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant dl360 g3

Table of Contents