Installing C Class Flash; Requirements; Procedures - Wyse C90LEW Installation Manual

Wyse c class and wyse r class flash upgrade option kit
Hide thumbs Also See for C90LEW:
Table of Contents

Advertisement

2

Installing C Class Flash

This chapter contains information for C30LE, C50LE, C90LE, C90LEW, and C90LE7
cloud client users who must install new flash.

Requirements

Procedures

1. Perform a proper shutdown of the cloud client by closing all files and ending your
2. Unplug the power cord and power adapter, remove all of the cables from the rear of the
3. Position the cloud client horizontally, remove the screw from the back of the cloud
Figure 1 Removing the top cover
Small Phillips screwdriver
Needle-nose pliers
(Optional) Plastic alignment tools or equivalent for prying
Warning
Flash modules may be susceptible to damage by Electro-Static Discharge
(ESD). All industry-standard cautions should be followed to avoid ESD.
Before you remove or install a module, touch any metal part of the chassis
and keep that contact with the chassis during the installation process.
Caution
Follow all precautions listed in the Quick-Start Guide that came with your
cloud client for disconnecting and reconnecting the cloud client.
session, and then press the power button to turn off the cloud client.
cloud client, and then detach any support feet.
client using a small Phillips screwdriver, and then use a plastic alignment tool to pry
and loosen the top cover as shown in Figure 1.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents