Dometic BRISK AIR 579 SERIES Installation Instructions Manual

Dometic BRISK AIR 579 SERIES Installation Instructions Manual

579 series, 590 series, & 595 series roof top air conditioner
Hide thumbs Also See for BRISK AIR 579 SERIES:

Advertisement

USA
SERVICE OFFICE
Dometic Corporation
2320 Industrial Parkway
Elkhart, IN 4656
574-294-25
CANADA
Dometic Corporation
46 Zatonski, Unit 3
Brantford, ON N3T 5L8
CANADA
59-720-9578
For Service Center
Assistance Call:
800-544-488
This manual must be read and understood
before installation, adjustment, service, or
maintenance is performed. This unit must
be installed by a qualified service technician.
Modification of this product can be extremely
hazardous and could result in personal injury
or property damage.
INSTALLATION
INSTRUCTIONS
REVISION:
Form No. 309395.066 8/07
(Replaces 309395.058)
(French 309660.063)
©2007 Dometic Corporation
LaGrange, IN 4676
INSTALLATION INSTRUCTIONS
BRISK AIR
579 Series, 590 Series, & 595 Series
ROOF TOP AIR CONDITIONER
3107210 AIR DISTRIBUTION BOX KIT and
3109226.005 COMFORT CONTROL CENTER
ELECTRONIC KIT
3109228.001 (White) Comfort Control Center
3109228.019 (Black) Comfort Control Center
Important:
These instructions must stay with unit.
Owner read carefully.
®
USED WITH
Lire et comprendre ce manuel avant de procéder
à l'installation, à des réglages, de l'entretien ou
des réparations. L'installation de cet appareil doit
être effectuée par un réparateur qualifié. Toute
modification de cet appareil peut être extrême-
ment dangereuse et entraîner des blessures ou
dommages matériels.
MODELS
57908.321
57915.522
57908.521
57915.531
57912.531
57915.536
57912.532
57915.541
57912.622
57915.546
57912.631
57915.622
57915.322
57915.631
57915.331
57915.731
57915.336
57915.741
57915.422
59016.521

RECORD THIS UNIT INFORMATION FOR FUTURE
REFERENCE:
Model Number
Serial Number
Date Purchased
TM
TM
59016.531
59516.603
59016.621
59516.631
59016.631
59516.731
59516.303
59516.331
59516.336
59516.501
59516.531
59516.536
59516.601

Advertisement

Table of Contents
loading

Summary of Contents for Dometic BRISK AIR 579 SERIES

  • Page 1 INSTALLATION INSTRUCTIONS REVISION: Form No. 309395.066 8/07 (Replaces 309395.058) (French 309660.063) Important: ©2007 Dometic Corporation Owner read carefully. LaGrange, IN 4676 INSTALLATION INSTRUCTIONS BRISK AIR ROOF TOP AIR CONDITIONER USED WITH 3107210 AIR DISTRIBUTION BOX KIT and 3109226.005 COMFORT CONTROL CENTER...
  • Page 2: Safety Instructions

    4.00 inches thick. B. The ability of the air conditioner to maintain the desired inside temperature depends on the heat gain of the RV. Some preventative measures taken by the occupants of the RV can reduce the heat gain and improve the performance of the air conditioner.
  • Page 3: Specifications

    INSTALLATION INSTRUCTIONS...
  • Page 4: Choosing Proper Location

    A. Read Installation and Operating Instructions carefully before attempting to start your air conditioner installa- tion. B. The Dometic Corporation will not be liable for any damages or injury incurred due to failure in following these instructions. C. Installation must comply with the National Electrical Code and any State or Local Codes or regulations.
  • Page 5: Roof Preparation

    If the load shed option is to be used, wires must be run from the load shed control to the Dometic A/C. If a furnace is to be connected, wires must be run from the furnace to the Dometic A/C. Read all of the following instructions before beginning the installation.
  • Page 6 RV. 5. The 4-/4” x 4-/4” (±/8”) opening is part of the return air system of the Air Conditioner and must be finished in accordance with NFPA Standard 501C Section 2.7. 6. Route a dedicated 2 VDC supply line (8-22 AWG) from the RV’s converter or battery to the roof opening.
  • Page 7 INSTALLATION INSTRUCTIONS press onto the base plate. 5. PLACINg THE AIR CONDITIONER ON THE ROOF A. Remove the Air Conditioner from the carton and discard. B. Place the Air Conditioner on the roof. FIg. 6 This unit weighs approximately 100 pounds. To pre- vent back injury, use a mechanical hoist to place Air Conditioner on roof.
  • Page 8 6. DISCHARgE DUCT & CEILINg TEMPLATE INSTALLATION Remove the air box and mounting hardware from their carton. The upper duct is shipped inside the lower duct which is part of the ceiling template. FIg. 8 Remove the upper duct from the ceiling template and locate it over the blower discharge.
  • Page 9: Trol Kit

    TROL KIT A. If your installation included the optional electric heat kit, install it at this time. Follow the instructions with the heat package for its installation procedure. B. Terminate the 4-conductor control cable(s) protruding into the 4-/4” x 4-/4” (±/8”) roof opening. The cable(s) must be terminated with an RJ--4C-6P telephone connector.
  • Page 10: System Configuration, Reset & Checkout

    8. SySTEM CONFIgURATION, RESET & CHECKOUT Now that the system is installed, it is necessary to configure the elec- tronics and check all operations. Refer to the Operating manual for a description of the air conditioner operation. A. ELECTRONIC CONTROL KIT CONFIgURATION Depending on the equipment options installed by the recreational vehicle manufacturer, the appropriate dip switches will need to be switched to the “ON”...
  • Page 11 D. Install four (4) wood screws (B) which hold the air box tight to ceiling, if desired. E. Reinstall return air grille and filter into air box. The air conditioner installation is now complete. Turn on power to the unit for operational check. Please read Unit Operating Instructions before proceeding.
  • Page 12: Mounting Parts

    MOUNTINg PARTS A. (4) /4” — #20 x 7” bolts B. (4) #8 x 5/8” long sharp point wood screws C. (7) #0 x 3/8” blunt point tapping screws D. () Hole Plug ELECTRONIC CONTROL KIT UNIT FIELD WIRINg DIAgRAM INSTALLATION INSTRUCTIONS AIR CONDITIONINg UNIT...

Table of Contents