Resister Inspection - DAELIM S-FIVE Service Manual

Hide thumbs Also See for S-FIVE:
Table of Contents

Advertisement

A.C. GENERATOR(CHARGING COIL)
INSPECTION
NOTE
·This test is done with the starter mounted to the
engine.
● Remove the luggage box. ( 3-3 )
● Disconnect the AC generator coupler. ( 3-3 )
● Measure the resistance of the charging coil (between
the white wire and ground) and the lighting coil
(between the yellow wire and ground).
STANDARD RESISTANCE
BETWEEN WHITE WIRE AND GROUND : 0.3~1.2Ω
BETWEEN YELLOW WIRE AND GROUND : 0.1~1.0Ω

RESISTER INSPECTION

● Remove the front cover. ( 3-5 )
● Measure the resistance between the register lead wire
and ground.
STANDARD VALUE (20℃)
RESISTER (6.7Ω 5W) GREEN/BLACK/BODY GROUND : 6.3~7.1Ω
RESISTER (5.9Ω 30W)PINK/BODY GROUND : 5.6~6.5Ω
NOTE
·Problems with the resister are caused by operational
problems of the starter.
(20℃)
BATTERY/CHARGING SYSTEM
ACG
COUPLER
13-9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sj50S-five sj50e

Table of Contents