Charging the UPS batteries
Allow the batteries to charge before putting the UPS into service.
IMPORTANT:
devices. The batteries charge to:
•
90% of their capacity within 4 hours
•
100% of their capacity within 24 hours
Starting power to the load
Start power to the load by placing the UPS in Operate mode (on page 27).
IMPORTANT:
Installing the ERM
Before installing the unit, review and adhere to all warnings provided in "Precautions (on page 13)."
WARNING:
equipment in the rack might cause the rack to become unstable. Install the heavier
components first, and then continue to populate the rack from the bottom to the top.
Install the mounting rails
1.
With one person on each side, lift the chassis to rail level and slide the chassis on the mounting rails.
2.
Attach the chassis to the rack using the supplied screws.
3.
Charge the batteries for at least 24 hours before supplying backup power to
AC power must be available the first time the UPS is started.
A risk of personal injury or damage to the equipment exists. Uneven loading of
("Installing the mounting
rails" on page 14).
Installation 24