BMW R1150RT - MAINTENANCE INTEGRAL ABS Maintenance Manual page 62

Table of Contents

Advertisement

Use the adjusting screw (arrow) to adjust play of
the choke cable to zero.
Push the rubber cap into position over the ad-
justing screw.
Move the handlebars all the way from left to right
and check the settings. Make sure that engine
speed does not vary when the handlebars are
moved in this way.
Repeatedly open the throttle gradually and in-
crease engine speed from idle to approximately
n = 2,500 rpm to check throttle-valve synchroni-
sation. (Readings shown by Synchro tester must
increase and decrease together). If necessary,
correct by turning the adjusting screws of the
throttle-valve Bowden cable.
L
Note:
Make sure that when the throttle grip is released
both throttle valves return to their fully closed posi-
tions.
Tighten the locknuts and recheck carburettor
balance.
Seal off the vacuum bores.
Assembly is the reverse of the disassembly
procedure.
Final inspection with road safety
and functional check
(Inspections I, II, III and IV)
Road safety check
Check wheels and tyres.
Check/correct tyre pressures.
Wait at least 10 minutes after heating the engine
to operating temperature in the trial run/road test
before checking/correcting engine oil level.
Tyre pressures:
one-up ............................... front 2.2 bar (31.90 psi)
........................................... rear 2.5 bar (36.26 psi)
R22000330
two-up ............................... front 2.5 bar (36.26 psi)
........................................... rear 2.9 bar (42.06 psi)
two-up + luggage ............... front 2.5 bar (36.26 psi)
........................................... rear 2.9 bar (42.06 psi)
Roadworthiness check
Lights
Telltale/warning lights
Horn
Instruments
Special equipment
Clutch
Gear shift
Steering
Footbrake and handbrake, Integral ABS
If necessary, take the motorcycle for a test ride.
00.57

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

R 1150 rt

Table of Contents