Download Print this page
UTICA BOILERS 550003450 Instructions
UTICA BOILERS 550003450 Instructions

UTICA BOILERS 550003450 Instructions

Chb 100/130; chb/ccb-150 optional floor base

Advertisement

Quick Links

Kit installation shall be completed by qualified agency.
!
WARNING
Fire, explosion, asphyxiation and electrical shock
hazard. Improper installation could result in death or
serious injury. Read these instructions and understand
all requirements, including requirements of authority
having jurisdiction, before beginning installation.
Installation not complete until appliance operation
is verified per Installation, Operation & Maintenance
Manual provided with boiler.
!
WARNING
Fire Hazard! Do not install on carpeting. Failure to
follow these instructions could result in death or
serious injury.
!
CAUTION
Laceration, burn hazard. Metal edges and parts may
have sharp edges and/or may be hot. Use appropriate
personal protection equipment to include safety
glasses and gloves when installing or servicing this
appliance. Failure to follow these instructions could
result in minor or moderate injury.
!
CAUTION
Boiler weight exceeds 75 pounds (34 kg). Do not lift
boiler without assistance.
Boiler Preparation for Base Install:
1.
Follow all instructions for proper installation as listed in the
Installation, Operation and Maintenance Manual including but
not limited to "Clearances to Combustible Materials".
!
WARNING
Electrical shock hazard. Turn OFF electrical power
supply at service panel.
2.
Verify all gas and electrical power are turned off before
attempting base installation.
!
WARNING
Burn hazard. Verify unit has cooled before base
installation. Use appropriate personal protection
equipment.
3.
Lay boiler down on its back on a location such as the floor.
4.
Remove 2 screws (A) at base of boiler. Lift cover up and push
towards top of boiler to remove cover. See Figure 1.
Base Preparation for Installation:
1.
Remove base and two (2) rails from their packaging.
2.
Remove supplied screws from separate parts bag included
with base.
3.
Remove front and side panel screws securing panels to frame
of base. Remove panels and set aside.
OPTIONAL FLOOR BASE KIT INSTRUCTIONS
550003450 - CHB 100/130
550003451 - CHB/CCB-150
Figure 1 - Front of Boiler
A
1
A
2
Figure 2 - Front - Optional Base
Notch In Rail to
Engage With Boiler
Front Rail
Front Clips
Depth
13" (33cm)
Illustrations are a depiction of the boiler for general location of parts and are
subject to change without notice.
3
Notch In Rail to
Engage With Boiler
Base Mounting
Rails w/4
Predrilled Holes
Height including feet
16.25" (41.3cm)
Width:
100/130 = 153/4" (40cm)
150 = 173/4" (45.1cm)
P/N 240012052 Rev. A [12/15/2017]

Advertisement

loading

Summary of Contents for UTICA BOILERS 550003450

  • Page 1 OPTIONAL FLOOR BASE KIT INSTRUCTIONS 550003450 - CHB 100/130 550003451 - CHB/CCB-150 Kit installation shall be completed by qualified agency. WARNING Figure 1 - Front of Boiler Fire, explosion, asphyxiation and electrical shock hazard. Improper installation could result in death or serious injury.
  • Page 2 CCB/CHB OPTIONAL FLOOR BASE KIT INSTRUCTIONS Base Installation to Boiler: Figure 3 - Rails Engaged - Self Tapping Screw Slide one (1) of two rails to back and side of boiler. Rails have Location notched flat piece at top. Twist rail so notched side is towards outside of boiler.

This manual is also suitable for:

550003451