Installing Three Sli-Ready Graphics Cards - Asus Z9PE-D8 WS Manual

Dual intel socket 2011
Hide thumbs Also See for Z9PE-D8 WS:
Table of Contents

Advertisement

4.
Align and firmly insert the SLI bridge connector to the goldfingers on each
graphics card. Ensure that the connector is firmly in place.
5.
Connect two independent auxiliary power sources from the power supply to
the two graphics cards separately.
6.
Connect a VGA or a DVI cable to the graphics card.
Goldfingers
7.2.3

Installing three SLI-ready graphics cards

1.
Prepare three SLI-ready graphics
cards.
2.
Insert the three graphics card
into the PCIEX16 slots. If your
motherboard has more than two
PCIEX16 slots, refer to Chapter 2
in this user manual for the locations
of the PCIEX16 slots recommended
for multi-graphics card installation.
3.
Ensure that the cards are properly
seated on the slots.
4.
Align and firmly insert the 3-
Way SLI bridge connector to the
goldfingers on each graphics card.
Ensure that the connector is firmly
in place.
5.
Connect three independent auxiliary
power sources from the power
supply to the three graphics cards
separately.
6.
Connect a VGA or a DVI cable to
the graphics card.
7-8
SLI bridge
3-Way SLI bridge
Chapter 7: Multiple GPU technology support

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents