P/N 0467434_D

JOINING INSTRUCTIONS

Sectional construction means that two or more
merchandisers may be joined in line yielding one
long continuous display requiring only one pair
of ends.
A
LL JOINTS MUST BE AIR
FORMATION OF ICE OR CONDENSATION
Prep Case
1. Check to be sure that merchandisers are
level. Locate Joining Kit and check contents.
2. Remove wire racks, display pans, and
interior panels. No tools are needed.
Note: FWE and FWEG end cases have joining
fasteners inserted in the appropriate locations.
Remove nuts and washers from outside of end
case before attempting to join.
Apply Gaskets to Right End
5
/
1. Apply the 1
in. (41 mm) gasket around the
8
perimeter of the case as shown. It must be at the
edge. Check to be sure that there are no gaps
between gasket and merchandiser.
2. Apply the 1 in. (25 mm) gasket across the
end shoe as shown. Each end of the gasket
should extend onto the 1
over. Check to be sure that there are no gaps
between merchandiser and gaskets.
3. On narrow and intermediate islands, wall
cases, and cases, apply the 1 in. (25 mm) gasket
at the top of the discharge and return air flues as
shown.
HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.
-
TIGHT TO PREVENT
.
5
/
inch gasket but not
8
IMPORTANT
• Do not stretch gasket,
especially around corners.
• Do not butt gaskets;
always overlap them as shown.
• Remove paper backing
after gasket has been applied.
• Perimeter gasket required by NSF.
FG, FNG & FIG
5
1
1
/
x
/
Foam Gasket
8
2
1
1 x
/
Foam Gasket
2
Low Temperature
1-5
Excel