8. The test results appear on the PV Test Result screen. See the next section
for how to interpret the results.
8.3.3

Displaying PV test results

1. At the standby display, press the [F7] key to display the Options menu.
2. Press the [7] key to display the Test menu.
3. Press the [2] key to choose PV Test Result.
4. To return to the standby display, press the [Esc] key three times.
Interpreting the PV test results display
Test Date & Time:
Attempts:
BBER:
Shore-to-Ship Attempts: Number of tests initiated by LES.
Ship-to-Shore Attempts: Number of tests initiated by MES.
Distress Alert:
Signal Strength:
Overall Result:
Options
1. Login
2. Logout
1. PV Test
3. Abort
2. PV Test Result
4. Select NCS
3. Diagnostic Test
5. Ocean Region
4. Distress Alarm Button Test
6. Test
Options
Test
1. Login
2. Logout
1. PV Test
3. Abort
2. PV Test Result
4. Select NCS
3. Self Test
5. Ocean Region
Test Date & Time
4. Distress Alarm Button Test
6. Test
Attempts
BBER
Shore-to-Ship Attempts
Ship-to Shore Attempts
Distress Alert
Signal strength
Overall Result
Sample PV test results
Date and time of test
Number of times the PV test was conducted.
Bulletin Board Error Rate (%). "Pass" appears for no
error.
"Pass (Test OK)" appears for successful testing.
"Pass" appears if signal strength is greater than
standard level.
"Pass" appears for satisfactory completion of the
test.
8. MAINTENANCE, TROUBLESHOOTING
Test
Test menu
PV Test Result
Ctrl+P: Print ESC: Quit
02-02-25 01:58 (UTC)
First attempt
Pass
First attempt
First attempt
Pass (Test OK)
Pass (Greater than Std level + 10dB)
Pass (Applicable tests pass)
8-5