2.2 SHIPMENT AND TRANSIT

The freezer has been assembled, operated and in-
spected at the factory. Upon arrival at the final destina-
tion, the complete freezer must be checked for any
damage which may have occurred during transit.
With the method of packaging used, the freezer should
arrive in excellent condition. THE CARRIER IS RE-
SPONSIBLE FOR ALL DAMAGE IN TRANSIT,
WHETHER VISIBLE OR CONCEALED. Do not pay the
freight bill until the freezer has been checked for dam-
age. Have the carrier note any visible damage on the
freight bill.
If concealed damaged and/or shortage is found later,
advise the carrier within 10 days and request inspection.
The customer must place claim for damages and/or
shortages in shipment with the carrier. Stoelting, Inc.
cannot make any claims against the carrier.

2.3 FREEZER INSTALLATION

Installation of the freezer involves moving the freezer
close to its permanent location, removing all crating,
setting in place, assembling parts, and cleaning.
A. Uncrate the freezer.
B. Accurate leveling is necessary for correct drainage
of freezer barrel and to insure correct overrun. Place
a spirit level on top of the freezer at each corner to
check for level condition. If adjustment is necessary,
level the freezer by turning the bottom part of each
leg in or out. Then separate freezer base gasket and
install with the seam to the back and the flat to the
bottom.
C. Air cooled freezers require correct ventilation. The
right side of the freezer is the air intake and must
have a 3" (7.5cm) clearance. Air discharges out of the
left side of the unit and must have 3" (7.5cm) clear-
ance. Do not obstruct the intake or discharge
(Fig. 4).
Fig. 4. Space and Ventilation Requirements
Failure to provide adequate ventalation will void
Warranty.
D. Place the OFF-ON switch in the OFF position. See
Figure 8.
E. Install the drip trays, drain trays, covers and other
miscellaneous parts on the freezer. (Fig. 5)
Figure 5. Installing Trays and Inserts
(F131 w/ blender shown)
F. Connect the power cord. The plug is designed for
208 or 230 volt/20 amp duty. Check the nameplate
on your freezer for proper supply. The unit must be
connected to a properly grounded receptacle. The
electrical cord furnished as part of the freezer has a
three prong grounding type plug (Fig. 6). The use of
an extension cord is not recommended. If one must
be used, use one with a wire size 12 gauge or heavier
with a ground wire. Do not use an adaptor to get
around grounding requirement.
Do not alter or deform electrical plug in any way.
Altering the plug to fit into an outlet of different
configuration may cause fire, risk of electrical
shock, product damage and will void the warranty.
Figure 6. Power Cord
4
CAUTION
WARNING

Advertisement

Table of Contents
loading

This manual is also suitable for:

Futura f144

Table of Contents