Rail Mounting / Layout

An alternative method of unit installation is to mount
the unit on rails supplied by others. The purpose of
mounting the unit on either rails or the GKD curb is to
elevate the unit away from moisture conditions and
to provide proper clearance for installation of water
drain traps.
• Rails should be designed to handle the weight of
the PVe unit, taking into consideration weight per
square inch on bearing surfaces. Rails should be
positioned as shown in the drawing below, taking
into consideration proper load distribution and
support by roof support elements.
• Make sure that rail positioning does not interfere
with either the RA Intake duct or the optional
straight down SA Discharge duct.
• Rails should extend beyond the unit a minimum
of 12 inches.
• Set unit on rails.
Isometric view of
PVe on rails
A
B
Side view of
PVe on rails
Unit Size
A
PVe-20
5
PVe-35
5
PVe-45
5
PVe-55
5
All dimensions are shown in inches.
*Zones B and C identify regions/zones where rails may
not be place due to ductwork.
C
D
B*
C*
D
14
13.25
7.75
14
12.00
6.50
14
15.50
10.5
14
18.75
13.25
Access Panel Description and
Location
Filters
Optional OA Damper
1
Optional RA Damper
Optional Face and Bypass Dampers
Plate Heat Exchanger
2
Optional Preheater
Plate Heat Exchanger
3
Control Center
4
Blowers
5
A
B
Model PVe Heat Recovery Unit
5
4
3
2
1
C
D
7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pve-35Pve-45Pve-55

Table of Contents