8. Connect the signal cable to the RTB Board (03P9249). See the interconnection diagram and
the figure shown below.
9. Attach three EMI cores to the signal cable as shown below.
Lead in
cable here.
EMI core
RFC-13
10.Fasten the signal cable with the cable clamp.
11.Undo the stay and close the cover. Securely fasten the scanner bolts.
Note: When you close the cover, set the gaskets to the grooves in the bottom chassis, then tighten
the bolts.
Run cable along here.
Antenna unit chassis, cover opened
Bottom
Chassis
Groove
Gasket
Antenna Bolt
Torque : 9.8 ±0.1 Nm
RTB Board
J821 VH9P
J822 VH2P
J824 NH13P
J823 VH4P
Clamp
1-17