Download Print this page
PowerBox DPC-12000 Series Installation And Operation Instructions

PowerBox DPC-12000 Series Installation And Operation Instructions

Advertisement

Quick Links

DPC-12000/15000
FIGURE 1
DPC-15000
FIGURE 2
DPC-12000
FIGURE 3
DPC-12000-D
 
 
 
SERIES INSTALLATION AND OPERATION INSTRUCTIONS
60
60
TEST
POWER ON
CIRCUITS PROTECTED
240V TIMED POWER ON
120V TIMED POWER ON
60
60
TEST
POWER ON
CIRCUITS PROTECTED
9
240V TIMED POWER ON
120V TIMED POWER ON
60
60
TEST
POWER ON
CIRCUITS PROTECTED
BANK 1 POWER ON
BANK 2 POWER ON
 
 
240 VOLT TIMED POWER
120 VOLT TIMED POWER
AMPS
60.00
240 VOLT TIMED POWER
120 VOLT TIMED POWER
11
10
BANK 1 240V
BANK 1 120V
12
13
 
120 VOLT
CONSTANT
DPC-12000
120 VOLT
CONSTANT
DPC-12000-D DUAL ZONE
BANK 2 240V
BANK 2 120V
8
14
15
 

Advertisement

loading

Summary of Contents for PowerBox DPC-12000 Series

  • Page 1     DPC-12000/15000 SERIES INSTALLATION AND OPERATION INSTRUCTIONS 240 VOLT TIMED POWER TEST FIGURE 1 DPC-15000 120 VOLT TIMED POWER 120 VOLT AMPS POWER ON CIRCUITS PROTECTED 60.00 240V TIMED POWER ON 120V TIMED POWER ON CONSTANT DPC-12000 240 VOLT TIMED POWER FIGURE 2 TEST DPC-12000...
  • Page 2 OVERVIEW: The Powerbox DPC-12000 and 15000 Series are 10-outlet lighting controllers that connect to a 4-wire, 240-volt main input, and provide 240-volt and 120-volt output power through 10 NEMA type 6-15 outlets and 5 NEMA type 5-15 outlets. Rated output capacity ranges from 30 amps to 60 amps continuous at 240 Volts, depending on the model. These units contain a microprocessor-controlled GFCI main circuit breaker that provides the ultimate in specialized protection for you and your equipment, when installed properly.
  • Page 3: Section 1. Main Connection

    120 Volts AC If ALL of the tests on your circuit produce the proper result, turn the breaker off and it is safe to plug your Powerbox into the outlet. If ANY of the test combinations do not produce the expected result, the circuit is wired incorrectly. Do not plug in the Powerbox. Have the circuit checked by an electrician.
  • Page 4 BASIC CONNECTION FROM PANEL SOME OF THE ITEMS YOU MAY NEED: "#$%&$'&!()#$*!+,%-#./%!0/1! ")*28:($*9$($#.%9!;$7)! "7*.#80/*#!-/%%)-#/'! 60 or 80 Amp double <=>:!?@8ABC!4$**8(/,%#! 2/'!3$'&4.')!.%5#$**$#./%6! pole circuit breaker. ,5)&!#/!4'$7!$%&!.%5,*$#)! ,5)&!2/'!+/.%.%9!4.')5!.%! ')-)7#$-*)!2/'!7*,9!D!7*$E! -/%%)-#./%5!($&)!4.#3! 3$'&4.')!.%5#$**$#./%6! .%5#$**$#./%6 "7*.#80/*#56!
  • Page 5: Section 3. Timer Programming Instructions

    10. When using a Flipbox in conjunction with your Powerbox lighting controller, it is recommended to power the ballasts off for 10 minutes during each flip cycle during the time the flip is set to occur. For instance, if your light flip times are 12:00 AM and 12:00 PM, you would program your Powerbox lighting controller’s...

This manual is also suitable for:

Dpc-15000 seriesDpc-12000-d