A. o. smith instruction manual copper boilers for hydronic heating and hot water supply 200 series, 201 series (36 pages)
Summary of Contents for A.O. Smith SLB/LW:1000
Page 1
PRINTED IN U.S.A. 0502 PROPANE GAS TRAIN ASSEMBLY See page 6 JACKET/FRAME ASSEMBLY See page 4 A.O. SMITH WATER PRODUCTS CO., INC. 5621 W. 115TH STREET • ALSIP, ILLINOIS 60803 Phone: 1-800-433-2545 • Fax: 1-800-433-2515 Website: www.hotwater.com PSD-3-152/a COMMERCIAL POWER BURNER BOILER...
Page 7
LB/LW CONTROL BOARD WHC 1502 Part Number 210128 LB/LW 1000 WIRING CHART COLOR GAUGE White Black Green White Black Green White Black Green Blue Yellow Brown White/Red White/Yellow White/Black Black/White Yellow/Blue Red/Green *** Use dash number to indicate length of wire. Example: 20 inch long red wire would be expressed as 170603-20.
Page 8
78468 99593-6 78469 22-16 Ga. 16-14 Ga. 22-18 Ga. Ignition Harness Assembly 210575 Tank Probe Harness Assembly 210604 Gas Valve Harness Assembly 210574-1 (Propane) Outlet Temperature Control/ ECO Assembly 210572 Tank Probe (LW Models) WIRING AND HARNESS ASSEMBLY 191673 42573 210091 #10 Stud Power...