3Com 2924-SFP User Manual page 22

Baseline switch plus
Table of Contents

Advertisement

22
C
1: G
HAPTER
ETTING
Manually set the IP
Address using the
Console Port
S
TARTED
Connecting the Workstation to the Switch
1 Connect the workstation to the console port using the console cable as
shown in Figure 6.
Figure 6 Connecting a Workstation to the Switch using the Console Port
Workstation
(with terminal emulation
software installed)
To connect the cable:
a Attach the cable's RJ-45 connector to the Console port of the switch.
b Attach the other end of the cable to the workstation.
2 Open your terminal emulation software and configure the COM port
settings to which you have connected the cable. The settings must be set
to match the default settings for the switch, which are:
38,400 baud (bits per second)
8 data bits
no parity
1 stop bit
no hardware flow control
Refer to the documentation that accompanies the terminal emulation
software for more information.
3 Power up the switch. The Power on Self Test (POST) will be performed.
The Switch 2916 and 2924 takes approximately one minute to boot.
You are now ready to manually set up the switch with IP information
using the command line interface.
You need to have the following information:
IP address
subnet mask
default gateway
Console Cable
Switch
Console Port
Connection

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2916-sfp plus3cblsg163cblsg242924-sfp plus

Table of Contents