Download Print this page

Nelson R75 Installation & Performance Details

End of pivot sprinkler

Advertisement

Quick Links

IMPORTANT: NOZZLE NEEDS TO BE INSTALLED BEFORE OPERATION!
1
2
Squeeze tabs on
Thread-in the 7TN
the side of the plate
nozzle.
assembly and pull.
R75 End of Pivot Sprinkler
3
4
Replace plate
Make sure shift lever
assembly. Guide shift
is between stops as
lever between stops
shown. Adjust stops
as shown in Fig. 4.
to give desired arc of
coverage.
Installation & Performance Details
REQUIRED PLUMBING
6" Minimum
Drain Required
Poor entrance conditions diminish
performance.
R75ASSY - 3/15

Advertisement

loading

Summary of Contents for Nelson R75

  • Page 1 R75ASSY - 3/15 R75 End of Pivot Sprinkler Installation & Performance Details IMPORTANT: NOZZLE NEEDS TO BE INSTALLED BEFORE OPERATION! REQUIRED PLUMBING 6” Minimum Squeeze tabs on Thread-in the 7TN Replace plate Make sure shift lever the side of the plate nozzle.
  • Page 2 -072, #72 (9/16”) White Walla Walla WA 99362 U.S.A. Order Tel: 509.525.7660 Nozzles Separately nelsonirrigation.com PERFORMANCE (U.S. UNITS) WARRANTY AND DISCLAIMER: Nelson #52 (13/32") #56 (7/16") #60 (15/32") #64 (1/2") #68 (17/32") #72 (9/16") Pressure Irrigation’s End of Pivot Sprinklers are...

This manual is also suitable for:

R75lp7tn11936-00211936-00112178-05212178-056 ... Show all