Boiler Maintenance Procedure; Tools And Test Equipment Required For Maintenance Procedure - Weil-McLain ULTRA ULTRA-105 Service Manual

Gas-fired water boiler series 1 & 2
Hide thumbs Also See for ULTRA ULTRA-105:
Table of Contents

Advertisement

-
GAS
FIRED WATER BOILER SERIES

Boiler maintenance procedure

VERIFY PROPER OPERATION AFTER SERVICING
Removing and reinstalling components can change boiler behavior. After any maintenance procedure, you must
prove the boiler is operating correctly. To do so, follow the complete procedure for boiler and system start-up,
beginning on page 31 of the Ultra Boiler manual. Failure to comply could result in severe personal injury, death
or substantial property damage.
OBTAIN REQUIRED MAINTENANCE KIT
BEFORE PROCEEDING!
Removing heat exchanger and burner components
may damage gaskets or components. You must
have the following Weil-McLain Maintenance
kit available to correctly perform the required
maintenance procedures. Failure to complete
could result in severe personal injury, death or
substantial property damage.
For
or
cludes igniter, igniter gasket, cover plate gasket, cover plate insulation,
burner gasket, venturi gasket, Sentinel inhibitor test kit
For
,
-230
or
-310
cludes igniter, igniter gasket, cover plate gasket, cover plate insulation,
burner gasket, venturi gasket, Sentinel inhibitor test kit
In addition, for
Weil-McLain part number
DISCONNECT POWER BEFORE
PROCEEDING
electrical power to the boiler before attempting
maintenance procedures. Failure to complete
could result in severe personal injury, death or
substantial property damage.
Tools and test equipment required for maintenance procedure, troubleshooting and combustion verification
25mm Torx screwdriver
7 mm Nut driver
10mm & 11mm nut drivers
4 mm Allen wrench (long-handled) and/or 8mm open-
end wrench
Digital multi-meter
Gas manometer
Combustion analyzer (Digital preferred)
Contact thermometer
Part number 550-100-029/0810
1 & 2
(see Ultra Boiler Manual for procedures)
— part number
383-500-605
)
— part number
383-500-620
)
, obtain exchanger cleaning too,
.
— Disconnect all
Re-install jacket front door
Re-install boiler jacket front door after servicing.
The boiler front door must be securely fastened
to the boiler to prevent boiler from drawing air
from inside the boiler room. This is particularly
important if the boiler is located in the same
room as other appliances. Failure to keep the door
securely fastened could result in severe personal
injury or death.
Clean and treat boiler water
(
in-
Obtain Sentinel X100 inhibitor and Sentinel inhibitor test kit
from Weil-McLain.
(
in-
After filling the system as directed in these instructions, use a
caulking gun to inject the X100 inhibitor into the system, fol-
lowing the instructions on the tube. Allow time for the water to
circulate and mix. Then check the inhibitor level. Add additional
inhibitor if necessary.
Test the pH of a sample of system water at least annually. The
pH of the water mixture must be between 7.0 and 8.5. (Or use
the Sentinel inhibitor test kit to check concentration.) If pH is
outside this range (or inhibitor test kit indicates low level), the
inhibitor level may not be sufficient to prevent corrosion. Add
X100 inhibitor if the need is indicated.
If antifreeze is used, use only antifreeze listed by Weil-McLain
as suitable for use with Ultra Gas Boilers. Follow all guidelines
provided. A list of approved antifreeze products is available at
www.Weil-McLain.com.
change gas valve or to add orifice from natural to propane
burner screws
Front cover plate of heat exchanger
Remove blower assembly from heat exchanger
Read AC and DC voltage, read ohms
Measure gas pressure
Measure CO
, CO and O
2
2
For checking surface temperatures of heat exchanger and pipes
33

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ultra-155Ultra-230Ultra-310Ultra-80

Table of Contents