Weider WESY3924.2 User Manual page 12

Resistance system
Table of Contents

Advertisement

23. Locate the Leg Lever Cable (32), which has two
ends that are the same length and a third end
that is longer.
Route the longest end of the Leg Lever Cable
(32) through the hole in the Front Leg (6), and
attach it inside of the hole in the Leg Lever (7)
with an M10 x 50mm Bolt (63) and an M10 Nylon
Locknut (76).
24. Attach a 90mm Pulley (28) inside of the hole in
the Front Leg (6) with an M10 x 91mm Bolt (90),
two 26mm Spacers (52), two M10 Washers (75),
and an M10 Nylon Locknut (76). Make sure that
the Pulley is above the Leg Lever Cable (32).
Slide the two free ends of the Leg Lever Cable
(32) onto the hook welded to the bottom of the
Bench Rail (5).
25. Locate the two Short Cables (33). Wrap one of
the Cables around a 90mm Pulley (28). Attach
the Pulley to a High Pulley Housing (21) with an
M10 x 42mm Button Head Bolt (71) and an M10
Nylon Locknut (76).
Repeat this step with the other Short Cable
(33).
26. Slide the four Foam Pads (26) onto the tubes on
the Front Leg (6) and the Leg Lever (7). Press
four 19mm Round Inner Caps (78) into the ends
of the tubes.
Make sure that all parts have been properly tightened. The use of the remaining parts will be explained in
27.
ADJUSTMENTS, beginning on the following page.
Before using the resistance system, pull the long cable a few times to Make sure that it moves smoothly
over the pulleys. If the cable does not move smoothly, find and correct the problem. IMPORTANT: If the
cables are not properly installed, they may be damaged when heavy resistance is used. See the
CABLE DIAGRAM on page 16 for proper cable routing.
23
6
63
7
24
5
6
90
75
52
52
25
76
26
26
78
6
26
7
12
32
76
32
Hook
28
75
76
21
71
28
33
26
78
26

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Max ultra

Table of Contents