Sound; Procedure 1 Diagnostic Test Program Execution Check; Procedure 2 Connector Check - Toshiba Portege R200 Maintenance Manual

Personal computer
Hide thumbs Also See for Portege R200:
Table of Contents

Advertisement

2.12 Sound

2.12 Sound

To check if the sound function is defective or malfunctioning, follow the troubleshooting
procedures below as instructed.
Procedure 1: Diagnostic Test Program Execution Check
Procedure 2: Connector Check
Procedure 3: Replacement Check
Procedure 1
Diagnostic Test Program Execution Check
Execute the Sound test in Sound Test program disk. Refer to Chapter 3, Tests and
Diagnostics for more information on how to perform the test program.
If any error is detected by the test, go to Procedure 2
Procedure 2
Connector Check
The connection of sound system is shown in the following figure.
As the connection may be defective, disassemble the PC and check each connection.
If the problem still occurs, go to Procedure 3.
PORTEGE R200 Maintenance Manual (960-519)
2 Troubleshooting
[CONFIDENTIAL]
2-47

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents